Industrial & Process Construction Estimating
AACE Class 1–5 industrial estimates for process piping, oil sands and petrochemical plants, mining, water and wastewater treatment, tanks and pressure vessels.
Technical Takeoff Scope & Engineering Overview
Industrial EPC and turnaround work runs to ASME B31.3 with reference to CSA B51, CSA Z662 for pipelines, and AACE estimate classes. We take off P&IDs, isometrics, alloy weld inches, rigging, instrumentation loops and outage productivity, and add camp, LOA and travel allowances for remote Canadian sites.
Governing Canadian Codes & Specifications
- CSA B51 with ASME B31.3
- CSA Z662 oil and gas pipeline systems
- ABSA / TSSA / Technical Safety BC jurisdictional standards
- AACE International estimate classes
Standard Deliverables & Formats
Our estimators prepare takeoffs with industry-standard Canadian estimating and takeoff software. Deliverables are unlocked Microsoft Excel workbooks and colour-coded marked-up PDFs, so you do not need a software licence to review them.
Sample Bill of Quantities Line Items (Industrial & Process)
Excerpt showing itemized MasterFormat coding, metric/imperial unit quantities, and spec notes typical of our deliverables.
| CSI Code | Description | Unit | Sample Qty | Specification Notes |
|---|---|---|---|---|
| 40 05 13 | 4" Sch 40S 316L Stainless Steel Process Piping (TIG Root / Butt-Welded) | LF | 1,640 | Includes argon purge, 10% X-ray NDE, spring supports & hydrotest |
| 46 53 00 | 80-Ft Diameter Stainless Secondary Clarifier Mechanism & Weir Launders | EA | 2 | Includes crane setting, grout swept floor & torque overload commissioning |
| 40 05 53 | ASME Section VIII Carbon Steel Vertical Pressure Vessel (150 PSIG) | EA | 3 | Includes heavy transport, tailing crane pick, anchor bolt torquing & trim |
What You Receive
- Unlocked Microsoft Excel Estimate (.xlsx)
- Colour-coded marked-up drawings (.pdf)
- Unpriced Vendor BOM spreadsheet
- Canadian postal-code calibrated crew rates
- Dual-Estimator QA Review
Provincial Hubs for Industrial & Process
Specialized Industrial & Process Scopes (15 Services)
Click any specialized service below to view itemized measured quantities, bid risk checklists, and local urban coverage.
Industrial Estimating
Industrial Piping Estimating
Process Piping Estimating
Plant Construction Estimating
Steel Plant Estimating
Manufacturing Facility Estimating
Power Plant Estimating
Oil and Gas Estimating
Refinery Estimating
Chemical Plant Estimating
Wastewater Treatment Estimating
Water Treatment Plant Estimating
Industrial Equipment Estimating
Tank Estimating
Pressure Vessel Estimating
Industrial & Process Construction Estimating FAQ
Common questions about estimating industrial & process projects across Canadian jurisdictions.
How much do industrial & process construction estimating cost? ▼
What deliverables are included with a Industrial & Process estimate? ▼
What software platforms do your industrial & process estimators operate? ▼
How are Canadian codes and standards addressed in Industrial & Process? ▼
Get Your Industrial & Process Construction Estimating Estimate in 24–48 Hours
Upload your drawing sets for a firm flat-fee proposal within 15 minutes during business hours. Complete CSI MasterFormat Excel & colour-coded marked-up PDF packages from CA$75.