Fire Protection & Fire Suppression Estimating
Wet, dry, pre-action, standpipe, fire pump, clean-agent and kitchen hood suppression takeoffs to NFPA standards referenced by the National Building and Fire Codes, with ULC-listed components.
Technical Overview
Fire protection bids depend on correct hazard classification (light, ordinary group 1/2, extra hazard, ESFR storage), grooved mains versus threaded branch lines, seismic bracing to NFPA 13, backflow and FDC assemblies, and ULC-listed devices. We include CAN/ULC-S536 and S537 inspection and verification where the specification calls for them.
- ✓ Turnaround: 24–48 hours
- ✓ Deliverables: Unlocked Excel BOQ + Marked PDF
- ✓ Proposal: Firm 15-minute response in business hours
- ✓ Confidentiality: Strict corporate NDA on request
Quantities Measured in Fire Protection
- ▸ NFPA 14 Class I/III standpipes, fire hose valves, roof manifolds, and Siamese FDCs
- ▸ NFPA 20 electric & diesel fire pumps, jockey pumps, controllers, and test headers
- ▸ Clean-agent Novec 1230 / FM-200 server room suppression & ULC-300 kitchen hood systems
Common Bid Traps We Catch
- ⚠ Missing dry-pendent heads in unconditioned canopies, loading docks, and soffits
- ⚠ Unpriced seismic 4-way riser/main sway bracing and upright + pendent double-layer ceilings
- ⚠ Municipal flow test fees, PE hydraulic stamp costs, and double-check detector assemblies
Representative Line Items for Fire Protection
Every line item is delivered in an unlocked Excel sheet with formula-linked unit rates and Canadian code notes.
| CSI Code | Description | Unit | Sample Qty | Canadian Spec Notes |
|---|---|---|---|---|
| 21 13 13 | 4" Sch 10 Roll-Grooved Black Steel Sprinkler Main w/ Listed Couplings | LF | 1,180 | Includes ULC/FM swivel hangers & seismic restraints |
| 21 13 13 | Concealed Quick-Response Pendent Sprinkler Head w/ Escutcheon & Flex Drop | EA | 340 | K-5.6 Chrome/White plate in ACT grid |
| 21 30 00 | 1000 GPM @ 100 PSI Horizontal Split-Case Electric Fire Pump Skid | EA | 1 | Includes jockey pump, transfer switch controller, startup |
| 21 22 00 | Clean-Agent FK-5-1-12 (Novec 1230) Data Room Suppression System | EA | 1 | Agent tanks, nozzles, cross-zone releasing panel & room integrity fan test |
Fire Protection Sub-Services & Specialisations
Detailed quantity surveys available for every branch of this trade across Canada.
Fire Protection Takeoffs by Canadian Metro
Calibrated with indicative local labour factors and regional code amendments.
Fire Protection Estimating FAQ
Clear answers about our Canadian estimation deliverables, turnaround, software and fees.
How much do fire protection & fire suppression estimating cost in Canada? ▼
What deliverables are included with a Fire Protection estimate? ▼
What software platforms and workflows do your fire protection estimators use? ▼
How are Canadian codes and standards addressed in Fire Protection? ▼
Are my bid figures and drawings kept confidential? ▼
Get a 15-Minute Proposal for Your Fire Protection Project
Upload your drawings now. Receive a firm, guaranteed flat fee starting from CA$75 CAD.