Industrial & Process Construction Estimating
AACE Class 1–5 industrial estimates for process piping, oil sands and petrochemical plants, mining, water and wastewater treatment, tanks and pressure vessels.
Technical Overview
Industrial EPC and turnaround work runs to ASME B31.3 with reference to CSA B51, CSA Z662 for pipelines, and AACE estimate classes. We take off P&IDs, isometrics, alloy weld inches, rigging, instrumentation loops and outage productivity, and add camp, LOA and travel allowances for remote Canadian sites.
- ✓ Turnaround: 24–72 hours
- ✓ Deliverables: Unlocked Excel BOQ + Marked PDF
- ✓ Proposal: Firm 15-minute response in business hours
- ✓ Confidentiality: Strict corporate NDA on request
Quantities Measured in Industrial & Process
- ▸ Water & wastewater treatment (WWTP/WTP) clarifiers, blowers, chemical feed skids, slide gates & Yard DIP
- ▸ API 650 field-erected storage tanks, ASME Sec VIII pressure vessels, heat exchangers & millwright setting
- ▸ AACE Class 5 through Class 1 CAPEX budgets, contingency risk modeling, and brownfield shutdown factors
Common Bid Traps We Catch
- ⚠ Live-plant hot-work permit delays and brownfield tie-in labour productivity loss (1.25x–1.45x factor)
- ⚠ 100% RT/PMI weld examination, post-weld heat treatment (PWHT), and hydro-testing blind flanges
- ⚠ Heavy-lift crawler crane mobilization, engineered rigging plans, and exotic valve lead-time contingencies
Representative Line Items for Industrial & Process
Every line item is delivered in an unlocked Excel sheet with formula-linked unit rates and Canadian code notes.
| CSI Code | Description | Unit | Sample Qty | Canadian Spec Notes |
|---|---|---|---|---|
| 40 05 13 | 4" Sch 40S 316L Stainless Steel Process Piping (TIG Root / Butt-Welded) | LF | 1,640 | Includes argon purge, 10% X-ray NDE, spring supports & hydrotest |
| 46 53 00 | 80-Ft Diameter Stainless Secondary Clarifier Mechanism & Weir Launders | EA | 2 | Includes crane setting, grout swept floor & torque overload commissioning |
| 40 05 53 | ASME Section VIII Carbon Steel Vertical Pressure Vessel (150 PSIG) | EA | 3 | Includes heavy transport, tailing crane pick, anchor bolt torquing & trim |
Industrial & Process Sub-Services & Specialisations
Detailed quantity surveys available for every branch of this trade across Canada.
Industrial & Process Takeoffs by Canadian Metro
Calibrated with indicative local labour factors and regional code amendments.
Industrial & Process Estimating FAQ
Clear answers about our Canadian estimation deliverables, turnaround, software and fees.
How much do industrial & process construction estimating cost in Canada? ▼
What deliverables are included with a Industrial & Process estimate? ▼
What software platforms and workflows do your industrial & process estimators use? ▼
How are Canadian codes and standards addressed in Industrial & Process? ▼
Are my bid figures and drawings kept confidential? ▼
Get a 15-Minute Proposal for Your Industrial & Process Project
Upload your drawings now. Receive a firm, guaranteed flat fee starting from CA$75 CAD.