MEP Estimating Services
Coordinated mechanical, electrical, plumbing and fire protection takeoffs and clash-checked budgets that close the scope gaps between Divisions 21, 22, 23 and 26–28.
Technical Overview
MEP divisions carry a large share of commercial construction cost, and most change orders happen at the hand-offs: mechanical starters and VFDs, electrical feeds, fire alarm duct-smoke tie-ins and condensate drains. Our MEP team estimates all four trades together, against CEC, NPC and NECB requirements, so nothing falls between subtrades.
- ✓ Turnaround: 24–48 hours
- ✓ Deliverables: Unlocked Excel BOQ + Marked PDF
- ✓ Proposal: Firm 15-minute response in business hours
- ✓ Confidentiality: Strict corporate NDA on request
Quantities Measured in MEP Combined
- ▸ Equipment electrical-vs-mechanical responsibility matrix (VFDs, disconnects, BAS wiring)
- ▸ Plenum/shaft congestion labour adjustments and BIM coordination allowances
- ▸ Firestopping, seismic bracing, housekeeping pads, and commissioning costs
Common Bid Traps We Catch
- ⚠ Double-counted or unowned VFD starters, duct smoke detectors, and motorized damper power
- ⚠ Undersized electrical switchgear feeders when mechanical schedules change in late addenda
- ⚠ Unbudgeted BIM 3D clash coordination hours on hospital, lab, and high-rise projects
Representative Line Items for MEP Combined
Every line item is delivered in an unlocked Excel sheet with formula-linked unit rates and Canadian code notes.
| CSI Code | Description | Unit | Sample Qty | Canadian Spec Notes |
|---|---|---|---|---|
| 21 13 13 | Wet-Pipe Automatic Fire Sprinkler System (Light/Ordinary Hazard) | SF | 45,000 | Schedule 10/40 mains, quick-response heads, hydraulic calc |
| 22 00 00 | Complete Commercial Domestic, Sanitary & Storm Plumbing Package | SF | 45,000 | Risers, core restroom groups, water heating plant |
| 23 00 00 | Packaged VAV HVAC + Hydronic Reheat + DDC BAS Controls | SF | 45,000 | RTUs, SMACNA ductwork, VAVs, certified TAB |
| 26 00 00 | 480V Distribution, LED Lighting, Controls & Addressable Fire Alarm | SF | 45,000 | Gear, feeders, branch power, NECB lighting power density |
MEP Combined Sub-Services & Specialisations
Detailed quantity surveys available for every branch of this trade across Canada.
MEP Combined Takeoffs by Canadian Metro
Calibrated with indicative local labour factors and regional code amendments.
MEP Combined Estimating FAQ
Clear answers about our Canadian estimation deliverables, turnaround, software and fees.
How much do mep estimating services cost in Canada? ▼
What deliverables are included with a MEP Combined estimate? ▼
What software platforms and workflows do your mep combined estimators use? ▼
How are Canadian codes and standards addressed in MEP Combined? ▼
Are my bid figures and drawings kept confidential? ▼
Get a 15-Minute Proposal for Your MEP Combined Project